Please keep the required application information, ownership details,
planning particulars and supporting documents ready before proceeding
with the TOD application. All uploaded PDF documents should be within
the prescribed file-size limit.
1
Applicant & Application Details
- Applicant Name
- Applicant Type – Owner(s) / Authorized Entity
- Contact Details – Mobile Number and Email ID
- Plot Address / Location
- Plot Area (in Sq.M)
- Application Type – New / Ongoing
-
For Ongoing Application – Grant of Sanction is mandatory;
Occupancy / Completion / Part Certificate may be uploaded,
wherever applicable
2
Ownership & Legal Details
-
Ownership Type – Lease Hold / Free Hold / Lease not Determined /
Private Land / Government Land
-
Ownership particulars and supporting ownership document(s)
-
In case of Authorized Entity – details of lawful / recorded
owner(s), up to 10 owners, along with legally enforceable authorization
-
Lease dues status and Lease NOC / approval of lessor, wherever applicable
-
Whether the plot is an Institutional Plot
-
In case of multiple owners – owner-wise details, ownership
document(s) and valid legally enforceable agreement among all owners
-
Whether the plot falls in an Unauthorized Colony; if Yes,
relevant category / ownership document(s) are required
-
Details of property encumbrances, if any
3
TOD & Planning Parameters
- Plot Coordinates
- % of Plot Area within TOD Zone – between 50% and 100%
- Whether plot is accessed from existing 18M ROW Road
-
Whether the proposal involves amalgamation / public elements;
specify the applicable elements and other details, if any
-
Land Use – Residential / Commercial / Industrial / Government /
Transportation / Public & Semi-Public (PSP)
- FAR Achieved
- Ground Coverage Achieved (%)
-
Whether relaxation in FAR / Ground Coverage / Green Area is sought;
upload supporting rationale document wherever applicable
-
Transportation Area Status – Operational / Future Operational /
Non-operational TOD Area, as applicable
-
For PSP plots – Original / Amalgamated status, original use,
same use status, school plot and playground particulars, as applicable
4
Mix Use, Green Area & Parking
-
For non-PSP proposals – Affordable Residential component should
be minimum 65%
-
Commercial / Facilities component should be minimum 10%
-
Remaining permissible component should not exceed 25%
-
Combined Mix Use components should not exceed 100%
-
Green Area and Green Area Percentage – minimum 8%
- Parking requirement / provision in ECS
5
Infrastructure & Services
- Water Supply details
- Sewerage details
-
UGR capacity and location, along with supporting document
-
DSTP treated water quantity
-
Whether treated water is used within the premises
-
Percentage of treated water proposed to be reused
-
Substation / Transformer details
-
Green Building compliance / details
6
Documents Required for TOD Application
-
Location Map with satellite imagery base – depicting area and
location of TOD plot with respect to TOD Zone Map and percentage
of plot area falling within TOD Zone (PDF, max: 50MB)
-
Key Plan with satellite imagery base – showing circulation network
(vehicular & pedestrian), road widths, transit corridor / station,
ingress & egress (PDF, max: 50MB)
-
Layout Plan – showing internal circulation pattern (vehicular &
pedestrian) and movement to / from abutting road(s) with ingress
& egress (PDF, max: 50MB)
-
Amalgamated drawing(s), wherever amalgamation is proposed
(PDF, max: 50MB)
-
Relaxation rationale document, wherever relaxation is sought
(PDF, max: 50MB)
-
Transportation rationale document, wherever applicable
(PDF, max: 50MB)
-
Ownership / authorization / lease related supporting documents,
wherever applicable (PDF, max: 50MB each)
7
Final Submission Requirements
-
Confirm that all requisite documents have been uploaded
-
Review all entered particulars before final submission
-
Mandatory declaration / undertaking must be accepted
before submission